|
|
|
Aug 06, 2026
|
|
CNBT 1359 - Project Scheduling 3 credit hours. 2 lecture hours. 2 lab hours. A study of conventional scheduling using critical-path-method, precedence networks, bar charts, monthly reports, and fast-track scheduling. Additional Fees: $30 lab fee for consumables Measurable Learning Outcomes: Prepare flow chart diagrams using the precedence networks; utilize the “forward pass” and “back pass” in-scheduling procedures; construct bar charts; and calculate critical paths in scheduling.
Add to Portfolio (opens a new window)
|
|
|